1. Now I have to weld construction rods together. The rods are in the ceiling surrounded by concrete, they were cut in the middle. I was instructed to open the concrete about 10-15 cm (4" - 6") on each side and weld a parallel bar, so that it connects the rods on both sides. I use 7018 2.5 mm.
My question is, how should I approach the weld, what`s the right technique, angle, stages...
I watched many youtube videos but need to know the right way for that job.
Seen here are 2 sample bars. Remember it will be in the ceiling.

http://i44.tinypic.com/250jfdj.jpg
2. The 2nd issue is to fill const. bars which were damaged by a disc grinder. I was told fill them with little jab strikes. How can I connect them to the ground without expanding the opening around them. Can I hold the ground clip with the glove (and pvc glove under it) while wlding ?

http://i43.tinypic.com/2mpl9hv.jpg
Thanks for any help on that